Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
顺电商城
博彩平台
正规博彩平台
Gambling-platform-sales@shimizu8.com
Betting-recommendation-feedback@national-wholesalers.com
Spinach-Forum-contact@taylankaucuk.com
Spinach-Forum-contact@taylankaucuk.com
体育博彩
Gambling-website-marketing@narrative-resources.com
赌博平台推荐
e世博
e世博
七月在线
复旦大学附属华东医院
神州钓鱼网 钓鱼论坛
中国课改网
社旗在线
蕲春论坛
恭王府
美乐乐装修网